Trimmed and finished the edges of the right side console, then made the various bends. Began planning the rest of the installation.
Took measurements off the fuselage and the false wooden spar in preparation for building a floor stand for the fuselage. (I need to have a firm base so I can climb in and begin constructing mounts for the ELT and strobe power units; and installing the static system, rudder cables, elevator bellcrank and autopilot servo.)